2025 – Additional Benthic Survey for Pier Improvement Works in Eastern Waters

Site:  Yim Tin Tsai Pier, Sai Kung

Supplement and update the ecological benthic baseline information in the vicinity of the pier under the improvement feasibility study.

VS6_site.JPG

2022 – Sediment Quality Monitoring and Benthic Survey for Harbour Area Treatment Scheme Stage 2A (Operational Stage)

Site:  Western Buffer Water Control Zone

Monitored and updated the sediment quality and ecological benthic baseline of the monitoring stations under the HATS Stage 2A PPM project. It was to verify the performance of the HATS Stage 2A by evaluating any changes of sediment quality and benthic communities after the implementation of HATS Stage 2A.

MNW B4 site2.JPG

2022 – Benthic Survey for Pier Improvement Works in Eastern Waters

Site:  Ma Liu Shui, Ma Nam Wat, Yim Tin Tsai, Yung Shue O

Obtained the ecological baseline information about the benthic communities of the piers and jetties under the improvement feasibility study.

2018_TKO.JPG

2021 – Benthic Survey for Tseung Kwan O Area 137 

Site:  Tseung Kwan O

Updated the benthic baseline information for the project 'Planning and Engineering Study for Re-planning of Tseung Kwan O Area 137 – Feasibility Study'

B2_site.JPG

2021 – Amphioxus Survey for Aberdeen Boat Club Middle Island

Site:  Middle Island, Aberdeen Boat Club

Updated the baseline information of amphioxus population under the project 'Aberdeen Boat Club Middle Island Development, Phase III, IV and V'.

P4220532 Dendronephthya sp.JPG

2021 – Coral Dive Survey and Benthic Survey for submarine cable of Lamma Island

Site:  Telegraph Bay  &  Pak Kok East, Lamma Island

Obtained ecological baseline on coral and benthic communities of the submarine cable landing points between Telegraph Bay and Pak Kok East. 

DSCN3121.JPG

2020 – Coral Dive Survey and Benthic Survey for Tai Po Kau Tide Gauge Station

Site:  Tai Po Kau Tide Gauge

Conducted an ecological baseline of the coral communities and benthic communities along the modified coastline and pier structure under the project 'Ecological Impact Assessment for Reconstruction of Tai Po Kau Tide Gauge Station'

Sha Tin Hoi.jpg

2020 – Benthic Survey for Sha Tin Hoi, Tolo Harbour

Site:  Sha Tin Hoi

Obtained benthic baseline information of the Sha Tin Hoi under the project 'Revitalization of Tai Wai Nullah and Fo Tan Nullah - Investigation'

PA181915.JPG

2020 – Coral Dive Survey and Benthic Survey for Upgrading of Tai Po Sewage Treatment Works

Site:  Tai Po Waterfront Park

Conducted an ecological baseline survey of the coral and benthic communities along the coastline of Tai Po Waterfront Park.

20201001_063600788_iOS Platygyra carnosa.jpg

2020 – Coral Dive Survey and Benthic Survey for submarine cable of Peng Chau

Site:  Nim Shue Wan, Lantau Island &  Tai Lei, Peng Chau

Obtained ecological baseline on coral and benthic communities of the submarine cable landing points between Nim Shue Wan and Tai Lei. 

B3_site01b.jpg

2020 – Benthic Survey for Ex-Shek O Quarry

Site:  Shek O Quarry

Collected ecological benthic baseline of the Ex-Shek O Quarry, Hong Kong Island under the project 'Relocation of Sha Tin Sewage Treatment Works to Caverns – Investigation, Design and Construction'.

Cyphastrea serailia.JPG

2020 – Coral Dive Survey and Benthic Survey for submarine cable of Cheung Chau

Site:  Tai Long Wan, Lantau Island &  Pak Tso Wan, Cheung Chau

Obtained ecological baseline on coral and benthic communities of the submarine cable landing points between Tai Long Wan and Pak Tso Wan. 

T6_07.jpg

2020 – Coral Dive Survey and Benthic Survey for submarine cable of Lamma Island

Site:  Sandy Bay, Cyber Port  &  Pak Kok Tsui, Lamma Island

Obtained ecological baseline on coral and benthic communities of the submarine cable landing points between Sandy Bay and Pak Kok Tsui. 

B7site_01.JPG

2019 – Benthic Survey for Aberdeen Boat Club Middle Island

Site:  Middle Island, Aberdeen Boat Club

Obtained the ecological baseline information under the project 'Aberdeen Boat Club Middle Island Development, Phase III, IV and V'.

B1_site02.JPG

2019 – Benthic Survey for Nai Chung, Tolo Harbour

Site:  Nai Chung

Obtained ecological benthic baseline of the waters near Nai Chung inside Tolo Harbour.

SHW B1 site.JPG

2019 – Benthic Survey for Siu Ho Wan, Lantau Island

Site:  Siu Ho Wan

Conducted benthic survey as a part of ecological monitoring programme for 'TCE Eco-Shoreline Trial' project.

REA2.JPG

2019 – Ecological Impact Assessment for the Extension of Siu Ho Wan Sewage Treatment Works

Site:  Siu Ho Wan

Obtained the ecological baseline of benthic fauna and coral communities along the coast of Siu Ho Wan, North Lantau.

B2_site01.JPG

2019 – Benthic Survey for North-West Tsing Yi

Site:  Tsing Yi

Conducted an ecological benthic survey in the coastal waters of North West Tsing Yi for the project 'Technical Study on Potential Sites for Relocation of Wholesale Markets and for Other Industrial Uses in North West Tsing Yi'

2018_TKO.JPG

2018 – Environmental Impact Assessment for Re-planning of Tseung Kwan O Area 137 

Site:  Tseung Kwan O

Investigated the benthic baseline of waters nearby Tsueng Kwan O Area for a re-planning project.

2018_LCC.JPG

2018 – Environmental Impact Assessment of Pier Pier Improvement Works in Eastern Waters of Hong Kong 

Site:  Kau Sai Village, Leung Shuen Wan, Sam Mun Tsai, Sham Chung, Lai Chi Chong

Predicted the potential ecological impacts of pier improvement works at Kau Sai Village, Leung Shuen Wan, Sam Mun Tsai, Sham Chung and Lai Chi Chong.

2018_PKP.JPG

2018 – Additional Survey for Environmental Impact Assessment of Pak Kok Pier Pier Improvement Works

Site:  Pak Kok Pier, Lamma Island

Conducted additional benthic survey to predict the potential ecological impacts of Pak Kok Pier improvement works.

2017_PKP.JPG

2017 – Environmental Impact Assessment of Pak Kok Pier Pier Improvement Works

Site:  Pak Kok Pier, Lamma Island

Predicted the potential ecological impacts of Pak Kok Pier improvement works.

2017_HKBCF.JPG

2017 – Ecological Baseline Survey of Hong Kong Boundary Crossing Facilities (HKBCF) Island

Site:  Hong Kong Boundary Crossing Facilities Island

Obtained the benthic baseline within the sea channel between Airport Island and Hong Kong Boundary Crossing Facilities (HKBCF) Island.

2017_LKST.JPG

2017 – Ecological Baseline Survey of Lung Kwu Sheng Tan, Tuen Mun

Site:  Lung Kwu Sheung Tan, Tuen Mun

Conducted a benthic survey in Lung Kwu Sheung Tan as a baseline update for a technical study on potential quarry sites at Tuen Mun West.

2017_SHW.JPG

2017 – Preliminary Ecological Survey for Siu Ho Wan Depot Redevelopment

Site:  Siu Ho Wan, north Lantau Island

Obtained the benthic baseline for the project 'Preliminary Design for Siu Ho Wan Depot Redevelopment Study'.

2016_LKST.JPG

2016 – Ecological Baseline Survey of Lung Kwu Sheng Tan, Tuen Mun

Site:  Lung Kwu Sheung Tan, Tuen Mun

Conducted a benthic survey in Lung Kwu Sheung Tan as a baseline update for a technical study on potential quarry sites at Tuen Mun West.

2015_MLS.JPG

2015 – Ecological Baseline Survey of Ma Liu Shui, Tolo Harbour

Site:  Ma Liu Shui, Tolo Harbour

Conducted a benthic baseline survey in coastal area of Ma Liu Shui, Tolo Harbour.

2015_Sharp.JPG

2015 – Additional Survey for Environmental Impact Assessment of Sharp Island Pier Improvement Works

Site:  Sharp Island, Sai Kung

Conducted additional survey to predict the potential ecological impacts of Sharp Island pier improvement works.

2015_Lamma.JPG

2015 – Environmental Impact Assessment of Navigation Channel Dredging for Lamma Power Station

Site:  Lamma Island (West)

Investigated the ecological impacts caused by the maintenance dredging for coal vessel navigation channel of Lamma Power Station, west of Lamma Island.

2015_LSW.JPG

2015 – Environmental Impact Assessment of submarine cable deployment in Lap Sap Wan

Site:  Lap Sap Wan, Cape D'Aguilar

Predicted the ecological impacts of proposed deployment of submarine cable in Lap Sap Wan, Cape D'Aguilar.

2014_STK.JPG

2014 – Environmental Impact Assessment of Sha Tau Kok Sewage Treatment Works upgrading

Site:  Sha Tau Kok Sea

Investigated the potential ecological impacts caused by the proposed new submarine outfall of Sha Tau Kok Sewage Treatment Works.

2014_YTT.JPG

2014 – Environmental Impact Assessment of Yim Tin Tsai Pier Improvement Works

Site:  Yim Tin Tsai, Sai Kung

Predicted the potential ecological impacts of Yim Tin Tsai pier improvement works.

2014_SKW.JPG

2014 – Environmental Impact Assessment of Sok Kwu Wan Coastal Modification Works

Site:  Sok Kwu Wan, Lamma Island

Investigated the ecological impacts caused by the proposed seawall extension and submarine sewage outfall construction of Sok Kwu Wan, Lamma Island.

2014_LammaIsland.JPG

2014 – Environmental Impact Assessment of Navigation Channel Dredging for Lamma Power Station

Site:  Lamma Island (West)

Investigated the ecological impacts caused by the maintenance dredging for coal vessel navigation channel of Lamma Power Station, west of Lamma Island.

2014_SharpIsland.JPG

2014 – Environmental Impact Assessment of Sharp Island Pier Improvement Works

Site:  Sharp Island, Sai Kung

Predicted the potential ecological impacts of Sharp Island pier improvement works.

2014_ShaTauKok.JPG

2014 – Ecological Monitoring of Sha Tau Kok Sea

Site:  Sha Tau Kok Sea

Conducted an ecological monitoring to investigate the impact caused by expansion of Sha Tau Kok Sewage Treatment Works.

2013_YauTong.JPG

2013 – Environmental Impact Assessment of Yau Tong Bay Development

Site:  Yau Tong Bay

Conducted a verification survey of ecological impact assessment for ‘Yau Tong Bay development’ project.

2013_ShekO.JPG

2013 – Environmental Impact Assessment of Shek O Quarry

Site:  Shek O Quarry, Tai Tam Bay

Predicted the ecological impacts of proposed marine works (e.g. refilling of rocks and sands) and coastal modification works nearby Shek O Quarry.

2013_MuiWO.JPG

2013 – Environmental Impact Assessment of Mui Wo River

Site:  Mui Wo

Investigated any ecological impacts caused by the proposed drainage improvement works of Mui Wo River.

A.JPG

2012 – Environmental Impact Assessment of Pillar Point Sewage Treatment Works construction

Site:  Northwestern water control zone

Implemented a long term benthic baseline monitoring programme for the sensitive receivers along Tuen Mun coast under the construction of Pillar Point Sewage Treatment Works.

B.JPG

2012 – Environmental Impact Assessment of Sha Tau Kok Sewage Treatment Works upgrading 

Site: Sha Tau Kok

Investigated any ecological impacts caused by the proposed dredging works at submarine outfall of Sha Tau Kok Sewage Treatment Works

C.JPG

2012 – Environmental Monitoring of Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road

Site: Tung Chung Wan

Implemented a long term ecological baseline monitoring programme (covering intertidal community, horseshoe crab and seagrass) in Tung Chung Bay and San Tau for the infrastructural project ‘Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road’.

D.JPG

2012 – Environmental Impact Assessment for Express Rail Link (XRL) 

Site: Tsing Chau Wan

Conducted ecological benthic survey to investigate the potential impacts of the dredging works at Tsing Chau Wan barging point for the XRL infrastructural project.

E.JPG

2012 – Environmental Impact Assessment of Widening of Shan Pui River and Tin Shui Wai Nullah

Site: Shan Pui River & Tin Shui Wai

Investigated the ecological impacts on the benthic community caused by the proposed mangrove removal works at Shan Pui River and Tin Shui Wai Nullah.

F.JPG

2011 – Environmental Impact Assessment of Southwestern Tsing Yi

Site: Tsing Yi

Conducted benthic survey to investigate the ecological value of the southwestern Tsing Yi Island in the Western Buffer WCZ.

G.JPG

2011 – EM&A Analysis of Benthic Response to HATS Stage 2A

Site: Victoria Harbour

Performed data analysis of a monitoring programme to determine any benthic community changes caused by the chlorinated effluent from Stonecutter Island Sewage Treatment Works under the Harbour Area Treatment Scheme Stage 2A.

H.jpg

2010 – Harbour Area Treatment Scheme Stage 2A Sewage Conveyance System

Site: Sandy Bay

Conducted benthic survey at Sandy Bay for estimating any ecological impacts of the barging point operation for the project.

I.JPG

2010 – Environmental Impact Assessment for Express Rail Link (XRL)

Site: Tai Lam Kok

Participated in the environmental impact assessment by providing benthic survey around Tai Lam Kok, Tuen Mun for the planned barging point for the construction of Express Rail Link.

J.JPG

2010 – Environmental Impact Assessment for Yau Tong Bay Development

Site: Yau Tong Bay

Investigated the ecological condition of benthic environment in Yau Tong Bay as a part of feasibility study of the project.

K.jpg

2009 – Environmental Impact Assessment for Shatin To Central Link (SCL) -- Cross Harbour Section (Phase II)

Site: Shek O Quarry

Collect marine benthic baseline around Shek O of southern Hong Kong to investigate the potential impacts of Shek O Quarry IMF Fabrication Yard.

L.jpg

2009 –Environmental Impact Assessment for remediation works of benthic environment in Fish Culture Zones

Site: Yim Tin Tsai & Sha Tau Kok

Undertook additional benthic survey at Yim Tin Tsai and Sha Tau Kok for the project of sediment remediation works in fish culture zones.

M.jpg

2009 - Environmental Impact Assessment for Shatin To Central Link (SCL) -- Cross Harbour Section (Phase II)

Site: Causeway Bay Typhoon Shelter

Investigated the ecological benthic baseline in the Causeway Bay Typhoon Shelter as part of project EIA.

N.jpg

2009 - Engineering Investigation and Environmental Studies for Integrated Waste - Management Facilities Phase 1

Site: Shek Kwu Chau

Conducted a benthic survey around Shek Kwu Chau for providing advice on the environmental acceptability and feasibility of the deployment of submarine cable of IWMF.

O.JPG

2009 - Environmental Impact Assessment for Shatin To Central Link (SCL) -- Cross Harbour Section (Phase II)

Site: Tseung Kwan O

Advised on the environmental impact assessment of the IMT Fabrication Yard at Tseung Kwan O by undertaking a benthic survey in Junk Bay.

P.JPG

2009 - Environmental Impact Assessment for Shatin To Central Link (SCL) – Additional Ecological Survey

Site: Tsing Yi & To Kwa Wan

Took part in the further benthic study of the possible impact by the dredging works at western Tsing Yi and Hoi Sham Park in To Kwa Wan.

Q.jpg

2009 – Environment Impact Assessment for the construction of Tseung Kwan O – Lam Tin Tunnel

Site: Junk Bay

Assessed the impact by the project to the neighborhood marine environment by conducting benthic survey in Junk Bay.

R.JPG

2009 - Environmental Impact Assessment for remediation works of benthic environment in Fish Culture Zones

Site: Yin Tin Tsai, Sha Tau Kok, Yung Shue Au, Po Toi O

Impact assessment of fish raft relocation and sediment dredging by providing benthic survey around the Fish Cultural Zones (Yim Tin Tsai, Sha Tau Kok, Yung Shue Au and Po Toi O)

S.JPG

2009 - Environmental Impact Assessment for Shatin-to-Central Link (SCL) -- Cross Harbour Section (Phase II)

Site: Victoria Harbour

Undertook a baseline ecological survey in Victoria Harbour to investigate the potential impact to marine benthic environment along the cross harbour rail section.

T.JPG

2009 - Environmental Impact Assessment for Barging Point at Lung Kwu Sheung Tan, Tuen Mun

Site: Lung Kwu Sheung Tan

Conducted benthic survey at Lung Kwn Sheung Tan of Tuen Mun for investigating the ecological impact of the barging point construction.

U.JPG

2009 - Engineering Investigation and Environmental Studies for Integrated Waste - Management Facilities (IWMF) Phase 1

Site: Shek Kwu Chau

Conducted ecological impact assessment on the benthic environment around Shek Kwu Chau for the feasibility study of the construction of Integrated Waste Management Facilities (IWMF).

V.JPG

2009 – Environmental Studies on Sai Kung Sewage Treatment Works Phase II Upgrading

Site: Sai Kung

Undertook a baseline ecological survey at Inner Port Shelter of Sai Kung for assessing the impact caused by the project works.

W.JPG

2009 – Expansion of Hong Kong International Airport

Site: Chek Lap Kok

Conducted the benthic survey at the south-eastern coast of Hong Kong International Airport at Chek Lap Kok for the construction of Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road.

X.jpg

2008 – Monitoring programme of the Artificial Wetland of ‘Deep Bay Link’ project

Site: Deep Bay

Took part in the monitoring works by conducting quarterly benthic survey for an artificial wetland.

Y.jpg

2008 - Environmental Review on Deployment of a Small Scale Artificial Reefs Underneath the Jockey Club WWF Hong Kong Hoi Ha Marine Life Centre

Site: Hoi Ha Wan

Participated in the review works by covering the part of benthic survey at Hoi Ha Wan

Flat H, 15/F,  

Wing Kin Industrial Building, 4-6 Wing Kin Road, Kwai Chung, N.T., H.K.

Call

T: (852) 2422 4001

​

Mon - Fri

9:00 - 17:00

© 2025 by

Neanthes Eco-Consultant Ltd.

bottom of page