.png)
PROJECTS

2025 – Additional Benthic Survey for Pier Improvement Works in Eastern Waters
Site: Yim Tin Tsai Pier, Sai Kung
Supplement and update the ecological benthic baseline information in the vicinity of the pier under the improvement feasibility study.

2022 – Sediment Quality Monitoring and Benthic Survey for Harbour Area Treatment Scheme Stage 2A (Operational Stage)
Site: Western Buffer Water Control Zone
Monitored and updated the sediment quality and ecological benthic baseline of the monitoring stations under the HATS Stage 2A PPM project. It was to verify the performance of the HATS Stage 2A by evaluating any changes of sediment quality and benthic communities after the implementation of HATS Stage 2A.

2022 – Benthic Survey for Pier Improvement Works in Eastern Waters
Site: Ma Liu Shui, Ma Nam Wat, Yim Tin Tsai, Yung Shue O
Obtained the ecological baseline information about the benthic communities of the piers and jetties under the improvement feasibility study.

2021 – Benthic Survey for Tseung Kwan O Area 137
Site: Tseung Kwan O
Updated the benthic baseline information for the project 'Planning and Engineering Study for Re-planning of Tseung Kwan O Area 137 – Feasibility Study'

2021 – Amphioxus Survey for Aberdeen Boat Club Middle Island
Site: Middle Island, Aberdeen Boat Club
Updated the baseline information of amphioxus population under the project 'Aberdeen Boat Club Middle Island Development, Phase III, IV and V'.

2021 – Coral Dive Survey and Benthic Survey for submarine cable of Lamma Island
Site: Telegraph Bay & Pak Kok East, Lamma Island
Obtained ecological baseline on coral and benthic communities of the submarine cable landing points between Telegraph Bay and Pak Kok East.

2020 – Coral Dive Survey and Benthic Survey for Tai Po Kau Tide Gauge Station
Site: Tai Po Kau Tide Gauge
Conducted an ecological baseline of the coral communities and benthic communities along the modified coastline and pier structure under the project 'Ecological Impact Assessment for Reconstruction of Tai Po Kau Tide Gauge Station'

2020 – Benthic Survey for Sha Tin Hoi, Tolo Harbour
Site: Sha Tin Hoi
Obtained benthic baseline information of the Sha Tin Hoi under the project 'Revitalization of Tai Wai Nullah and Fo Tan Nullah - Investigation'

2020 – Coral Dive Survey and Benthic Survey for Upgrading of Tai Po Sewage Treatment Works
Site: Tai Po Waterfront Park
Conducted an ecological baseline survey of the coral and benthic communities along the coastline of Tai Po Waterfront Park.

2020 – Coral Dive Survey and Benthic Survey for submarine cable of Peng Chau
Site: Nim Shue Wan, Lantau Island & Tai Lei, Peng Chau
Obtained ecological baseline on coral and benthic communities of the submarine cable landing points between Nim Shue Wan and Tai Lei.

2020 – Benthic Survey for Ex-Shek O Quarry
Site: Shek O Quarry
Collected ecological benthic baseline of the Ex-Shek O Quarry, Hong Kong Island under the project 'Relocation of Sha Tin Sewage Treatment Works to Caverns – Investigation, Design and Construction'.

2020 – Coral Dive Survey and Benthic Survey for submarine cable of Cheung Chau
Site: Tai Long Wan, Lantau Island & Pak Tso Wan, Cheung Chau
Obtained ecological baseline on coral and benthic communities of the submarine cable landing points between Tai Long Wan and Pak Tso Wan.

2020 – Coral Dive Survey and Benthic Survey for submarine cable of Lamma Island
Site: Sandy Bay, Cyber Port & Pak Kok Tsui, Lamma Island
Obtained ecological baseline on coral and benthic communities of the submarine cable landing points between Sandy Bay and Pak Kok Tsui.

2019 – Benthic Survey for Aberdeen Boat Club Middle Island
Site: Middle Island, Aberdeen Boat Club
Obtained the ecological baseline information under the project 'Aberdeen Boat Club Middle Island Development, Phase III, IV and V'.

2019 – Benthic Survey for Nai Chung, Tolo Harbour
Site: Nai Chung
Obtained ecological benthic baseline of the waters near Nai Chung inside Tolo Harbour.

2019 – Benthic Survey for Siu Ho Wan, Lantau Island
Site: Siu Ho Wan
Conducted benthic survey as a part of ecological monitoring programme for 'TCE Eco-Shoreline Trial' project.

2019 – Ecological Impact Assessment for the Extension of Siu Ho Wan Sewage Treatment Works
Site: Siu Ho Wan
Obtained the ecological baseline of benthic fauna and coral communities along the coast of Siu Ho Wan, North Lantau.

2019 – Benthic Survey for North-West Tsing Yi
Site: Tsing Yi
Conducted an ecological benthic survey in the coastal waters of North West Tsing Yi for the project 'Technical Study on Potential Sites for Relocation of Wholesale Markets and for Other Industrial Uses in North West Tsing Yi'

2018 – Environmental Impact Assessment for Re-planning of Tseung Kwan O Area 137
Site: Tseung Kwan O
Investigated the benthic baseline of waters nearby Tsueng Kwan O Area for a re-planning project.

2018 – Environmental Impact Assessment of Pier Pier Improvement Works in Eastern Waters of Hong Kong
Site: Kau Sai Village, Leung Shuen Wan, Sam Mun Tsai, Sham Chung, Lai Chi Chong
Predicted the potential ecological impacts of pier improvement works at Kau Sai Village, Leung Shuen Wan, Sam Mun Tsai, Sham Chung and Lai Chi Chong.

2018 – Additional Survey for Environmental Impact Assessment of Pak Kok Pier Pier Improvement Works
Site: Pak Kok Pier, Lamma Island
Conducted additional benthic survey to predict the potential ecological impacts of Pak Kok Pier improvement works.

2017 – Environmental Impact Assessment of Pak Kok Pier Pier Improvement Works
Site: Pak Kok Pier, Lamma Island
Predicted the potential ecological impacts of Pak Kok Pier improvement works.

2017 – Ecological Baseline Survey of Hong Kong Boundary Crossing Facilities (HKBCF) Island
Site: Hong Kong Boundary Crossing Facilities Island
Obtained the benthic baseline within the sea channel between Airport Island and Hong Kong Boundary Crossing Facilities (HKBCF) Island.

2017 – Ecological Baseline Survey of Lung Kwu Sheng Tan, Tuen Mun
Site: Lung Kwu Sheung Tan, Tuen Mun
Conducted a benthic survey in Lung Kwu Sheung Tan as a baseline update for a technical study on potential quarry sites at Tuen Mun West.

2017 – Preliminary Ecological Survey for Siu Ho Wan Depot Redevelopment
Site: Siu Ho Wan, north Lantau Island
Obtained the benthic baseline for the project 'Preliminary Design for Siu Ho Wan Depot Redevelopment Study'.

2016 – Ecological Baseline Survey of Lung Kwu Sheng Tan, Tuen Mun
Site: Lung Kwu Sheung Tan, Tuen Mun
Conducted a benthic survey in Lung Kwu Sheung Tan as a baseline update for a technical study on potential quarry sites at Tuen Mun West.

2015 – Ecological Baseline Survey of Ma Liu Shui, Tolo Harbour
Site: Ma Liu Shui, Tolo Harbour
Conducted a benthic baseline survey in coastal area of Ma Liu Shui, Tolo Harbour.

2015 – Additional Survey for Environmental Impact Assessment of Sharp Island Pier Improvement Works
Site: Sharp Island, Sai Kung
Conducted additional survey to predict the potential ecological impacts of Sharp Island pier improvement works.

2015 – Environmental Impact Assessment of Navigation Channel Dredging for Lamma Power Station
Site: Lamma Island (West)
Investigated the ecological impacts caused by the maintenance dredging for coal vessel navigation channel of Lamma Power Station, west of Lamma Island.

2015 – Environmental Impact Assessment of submarine cable deployment in Lap Sap Wan
Site: Lap Sap Wan, Cape D'Aguilar
Predicted the ecological impacts of proposed deployment of submarine cable in Lap Sap Wan, Cape D'Aguilar.

2014 – Environmental Impact Assessment of Sha Tau Kok Sewage Treatment Works upgrading
Site: Sha Tau Kok Sea
Investigated the potential ecological impacts caused by the proposed new submarine outfall of Sha Tau Kok Sewage Treatment Works.

2014 – Environmental Impact Assessment of Yim Tin Tsai Pier Improvement Works
Site: Yim Tin Tsai, Sai Kung
Predicted the potential ecological impacts of Yim Tin Tsai pier improvement works.

2014 – Environmental Impact Assessment of Sok Kwu Wan Coastal Modification Works
Site: Sok Kwu Wan, Lamma Island
Investigated the ecological impacts caused by the proposed seawall extension and submarine sewage outfall construction of Sok Kwu Wan, Lamma Island.

2014 – Environmental Impact Assessment of Navigation Channel Dredging for Lamma Power Station
Site: Lamma Island (West)
Investigated the ecological impacts caused by the maintenance dredging for coal vessel navigation channel of Lamma Power Station, west of Lamma Island.

2014 – Environmental Impact Assessment of Sharp Island Pier Improvement Works
Site: Sharp Island, Sai Kung
Predicted the potential ecological impacts of Sharp Island pier improvement works.

2014 – Ecological Monitoring of Sha Tau Kok Sea
Site: Sha Tau Kok Sea
Conducted an ecological monitoring to investigate the impact caused by expansion of Sha Tau Kok Sewage Treatment Works.

2013 – Environmental Impact Assessment of Yau Tong Bay Development
Site: Yau Tong Bay
Conducted a verification survey of ecological impact assessment for ‘Yau Tong Bay development’ project.

2013 – Environmental Impact Assessment of Shek O Quarry
Site: Shek O Quarry, Tai Tam Bay
Predicted the ecological impacts of proposed marine works (e.g. refilling of rocks and sands) and coastal modification works nearby Shek O Quarry.

2013 – Environmental Impact Assessment of Mui Wo River
Site: Mui Wo
Investigated any ecological impacts caused by the proposed drainage improvement works of Mui Wo River.

2012 – Environmental Impact Assessment of Pillar Point Sewage Treatment Works construction
Site: Northwestern water control zone
Implemented a long term benthic baseline monitoring programme for the sensitive receivers along Tuen Mun coast under the construction of Pillar Point Sewage Treatment Works.

2012 – Environmental Impact Assessment of Sha Tau Kok Sewage Treatment Works upgrading
Site: Sha Tau Kok
Investigated any ecological impacts caused by the proposed dredging works at submarine outfall of Sha Tau Kok Sewage Treatment Works

2012 – Environmental Monitoring of Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road
Site: Tung Chung Wan
Implemented a long term ecological baseline monitoring programme (covering intertidal community, horseshoe crab and seagrass) in Tung Chung Bay and San Tau for the infrastructural project ‘Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road’.

2012 – Environmental Impact Assessment for Express Rail Link (XRL)
Site: Tsing Chau Wan
Conducted ecological benthic survey to investigate the potential impacts of the dredging works at Tsing Chau Wan barging point for the XRL infrastructural project.

2012 – Environmental Impact Assessment of Widening of Shan Pui River and Tin Shui Wai Nullah
Site: Shan Pui River & Tin Shui Wai
Investigated the ecological impacts on the benthic community caused by the proposed mangrove removal works at Shan Pui River and Tin Shui Wai Nullah.

2011 – Environmental Impact Assessment of Southwestern Tsing Yi
Site: Tsing Yi
Conducted benthic survey to investigate the ecological value of the southwestern Tsing Yi Island in the Western Buffer WCZ.

2011 – EM&A Analysis of Benthic Response to HATS Stage 2A
Site: Victoria Harbour
Performed data analysis of a monitoring programme to determine any benthic community changes caused by the chlorinated effluent from Stonecutter Island Sewage Treatment Works under the Harbour Area Treatment Scheme Stage 2A.

2010 – Harbour Area Treatment Scheme Stage 2A Sewage Conveyance System
Site: Sandy Bay
Conducted benthic survey at Sandy Bay for estimating any ecological impacts of the barging point operation for the project.

2010 – Environmental Impact Assessment for Express Rail Link (XRL)
Site: Tai Lam Kok
Participated in the environmental impact assessment by providing benthic survey around Tai Lam Kok, Tuen Mun for the planned barging point for the construction of Express Rail Link.

2010 – Environmental Impact Assessment for Yau Tong Bay Development
Site: Yau Tong Bay
Investigated the ecological condition of benthic environment in Yau Tong Bay as a part of feasibility study of the project.

2009 – Environmental Impact Assessment for Shatin To Central Link (SCL) -- Cross Harbour Section (Phase II)
Site: Shek O Quarry
Collect marine benthic baseline around Shek O of southern Hong Kong to investigate the potential impacts of Shek O Quarry IMF Fabrication Yard.

2009 –Environmental Impact Assessment for remediation works of benthic environment in Fish Culture Zones
Site: Yim Tin Tsai & Sha Tau Kok
Undertook additional benthic survey at Yim Tin Tsai and Sha Tau Kok for the project of sediment remediation works in fish culture zones.

2009 - Environmental Impact Assessment for Shatin To Central Link (SCL) -- Cross Harbour Section (Phase II)
Site: Causeway Bay Typhoon Shelter
Investigated the ecological benthic baseline in the Causeway Bay Typhoon Shelter as part of project EIA.

2009 - Engineering Investigation and Environmental Studies for Integrated Waste - Management Facilities Phase 1
Site: Shek Kwu Chau
Conducted a benthic survey around Shek Kwu Chau for providing advice on the environmental acceptability and feasibility of the deployment of submarine cable of IWMF.

2009 - Environmental Impact Assessment for Shatin To Central Link (SCL) -- Cross Harbour Section (Phase II)
Site: Tseung Kwan O
Advised on the environmental impact assessment of the IMT Fabrication Yard at Tseung Kwan O by undertaking a benthic survey in Junk Bay.

2009 - Environmental Impact Assessment for Shatin To Central Link (SCL) – Additional Ecological Survey
Site: Tsing Yi & To Kwa Wan
Took part in the further benthic study of the possible impact by the dredging works at western Tsing Yi and Hoi Sham Park in To Kwa Wan.

2009 – Environment Impact Assessment for the construction of Tseung Kwan O – Lam Tin Tunnel
Site: Junk Bay
Assessed the impact by the project to the neighborhood marine environment by conducting benthic survey in Junk Bay.

2009 - Environmental Impact Assessment for remediation works of benthic environment in Fish Culture Zones
Site: Yin Tin Tsai, Sha Tau Kok, Yung Shue Au, Po Toi O
Impact assessment of fish raft relocation and sediment dredging by providing benthic survey around the Fish Cultural Zones (Yim Tin Tsai, Sha Tau Kok, Yung Shue Au and Po Toi O)

2009 - Environmental Impact Assessment for Shatin-to-Central Link (SCL) -- Cross Harbour Section (Phase II)
Site: Victoria Harbour
Undertook a baseline ecological survey in Victoria Harbour to investigate the potential impact to marine benthic environment along the cross harbour rail section.

2009 - Environmental Impact Assessment for Barging Point at Lung Kwu Sheung Tan, Tuen Mun
Site: Lung Kwu Sheung Tan
Conducted benthic survey at Lung Kwn Sheung Tan of Tuen Mun for investigating the ecological impact of the barging point construction.

2009 - Engineering Investigation and Environmental Studies for Integrated Waste - Management Facilities (IWMF) Phase 1
Site: Shek Kwu Chau
Conducted ecological impact assessment on the benthic environment around Shek Kwu Chau for the feasibility study of the construction of Integrated Waste Management Facilities (IWMF).

2009 – Environmental Studies on Sai Kung Sewage Treatment Works Phase II Upgrading
Site: Sai Kung
Undertook a baseline ecological survey at Inner Port Shelter of Sai Kung for assessing the impact caused by the project works.

2009 – Expansion of Hong Kong International Airport
Site: Chek Lap Kok
Conducted the benthic survey at the south-eastern coast of Hong Kong International Airport at Chek Lap Kok for the construction of Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road.

2008 – Monitoring programme of the Artificial Wetland of ‘Deep Bay Link’ project
Site: Deep Bay
Took part in the monitoring works by conducting quarterly benthic survey for an artificial wetland.

2008 - Environmental Review on Deployment of a Small Scale Artificial Reefs Underneath the Jockey Club WWF Hong Kong Hoi Ha Marine Life Centre
Site: Hoi Ha Wan
Participated in the review works by covering the part of benthic survey at Hoi Ha Wan